Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:rule:connect_flows_to_any_side [2024-01-08 20:25] – [Edit diagram] Anatoly Belaychuken:rule:connect_flows_to_any_side [2024-08-18 17:14] (current) – [Attach a control flow to any side of the activity box] Anatoly Belaychuk
Line 1: Line 1:
-====== Attach a control flow to any side of the activity box ======+====== Attach a sequence flow to any side of the activity box ======
  
-{{tag>"control flow" legacy}}+{{tag>sequence_flow legacy visual_style}}
  
 Feel free to attach control flow to the most convinient side of the activity box to make a diagram compact and visually attractive. Feel free to attach control flow to the most convinient side of the activity box to make a diagram compact and visually attractive.
Line 299: Line 299:
 ===== Notes ===== ===== Notes =====
  
-IDEF0 legacy. +  * IDEF0 prescribes the control flows to get out from right side of the source box and get into the left side of the destination so analysts with a heavy IDEF0 background tend to follow this rule when switching to BPMN. However there is no such limitation in BPMN.
- +
-===== Exceptions ===== +
- +
-Specify exceptions to the rule above, if any +
 ===== See also ===== ===== See also =====
  
-  * [[en:rule:do_not_number_activities]]+  * [[en:rule:time_flows_left_to_right]] 
 +  * [[en:rule:v_shaped_flow]] 
 +===== Автор(ы) =====
  
-===== Автор(ы) =====+ --- //[[user:bell|Anatoly Belaychuk]] 2024-01-08 20:29//
  
-Put signature here